Runway 4R Updates
- Began hydroexcavation and pre-construction surveying work.
- Located exisitng utilities.
- Hydroexcavation of job perimeter
- Continued hydroexcavation
- Restaked saw cut and updated utility asbuilt
- Fine graded stone lift
- Started paving asphalt pad
- Staked delineators, light cans, and swale.
- Grading work and light can installation.
Browning Engineering Limited