Toledo Updates

08/18/08-8/22/08
  • Surveyed Bridge
02/23/09-02/27/09
  • Bridge observations
8/10/09-8/14/09
  • Recorded bridge observations on steel, abutments, piers and swing
    span
03/03/10-03/05/10
  • Observations on bridge
  • Set new points on pier 3
  • Added truss length shots
8/19/10 and 8/20/10
  • Bridge Observations
Browning Engineering Limited