Browning Engineering Limited
6/23/08-6/27/08
- Pre-construction surveying of yard container lot and chassis lot in preparation for
paving project
7/07/08-7/11/08
- Milled full depth areas along track 18 "craneway"
- Finished Paving chassis area
- Continued grinding between tracks 18-19.
7/14/08-7/18/08
- Finished grinding track 19 loading area
- Finished paving stacking area & track 19 loading area
09/02/08-9/05/08
- Asbuilt new stripes along pad tracks
09/15/08-09/19/08
- Mapped all tracks from pad track #21 to Columbus Avenue
- Mapped maintenance building near Columbus