Browning Engineering Limited
  • Landers Yard

6/23/08-6/27/08
  • Pre-construction surveying of yard container lot and chassis lot in preparation for
    paving project

7/07/08-7/11/08
  • Milled full depth areas along track 18 "craneway"
  • Finished Paving chassis area
  • Continued grinding between tracks 18-19.

7/14/08-7/18/08
  • Finished grinding track 19 loading area
  • Finished paving stacking area & track 19 loading area

09/02/08-9/05/08
  • Asbuilt new stripes along pad tracks

09/15/08-09/19/08
  • Mapped all tracks from pad track #21 to Columbus Avenue
  • Mapped maintenance building near Columbus