- Cut and throw of main 1 shoofly back into original position, lined
existing main 2 panels at 14' offset of main 1.
- Installed track 3 ladder switch.
- Staked yard air steel casing pipe points and checked existing
pavement grades for K-Five. Asbuilt new sewer structure.
- Graded track 6 with tamper.
- Asbuilt Pad Expansion yard tracks 6, 7, and 8.
- Gave edge of tie, lined, and gave grades for track 5A.
- Mapped existing yard tracks for potential reconfiguration.
- Gave grades, lined, and mapped main 1 and 2 panels over 51st
St bridge.
- Mapped existing tracks for new curve design.
- Lined track 6 panels.
- Placed and lined switch for track 6 from track 2.
- Designed new south alignment for track 6.
- Measured, graded, and lined track 6 panel.
- Mapped more existing yard track.
- Painted out tracks 2-6, 9, and 10.
- Asbult existing yard track 1.
- Placed and lined track 6-7 crossover switches.
- Cut and throw tracks 7 and 8 south of 51st St, measured and
lined both tracks.
- Lined panel for track 7.
- Painted out north infiltration trench for K-Five, graded stone with
Northwest General Contractors.
- Set and aligned track 8-7 switch.
- Painted out C/L for tracks 6, 7, and 8 for visual.
- Graded CA-6 with K-Five in south of 51st St excavation
- Asbuilt shooflies
- Measured points and lengths for future cut and throw of
shooflies, north and south
- Measured switches and track lengths for cuts and installation of
switches.
- Graded stone for track 10 swing.
- Installed tracks 9 and 10 switches and their connecting panels,
graded for tamper.
- Asbuilt temporary air line locations.
- Checked and measured McHugh saw cut in temp track 40 and
41 area.
- Cut and throw of temp tracks 40 and 41, lined track.
- Painted temp tracks 40 and 41 and graded area.
- Checked track 10 excavation grades.
- Painted out tracks 8 and 9 with switches for visual.
- Shot and measured tracks in hangar for Mechanical Dept.
- Graded track 9 from south end to 51st St for tamper.
- Set nails for saw cut boundary on south end.
- Checked existing grades for temp track 40.
- Cut and throw mains 1 and 2 into shooflies, lined and graded
track.
- Topo area east of 51st St Bridge.
- Painted all Pad Expansion tracks in area south of 51st St for
visual.
- Measured CA-6 on 51st St Bridge.
- Measured and marked out saw cut areas for mains 1 and 2 in
preparation for cut and throw.
- Lined and raised main 1 and 2 shoofly panels from south end to
51st St bridge.
- Spiked and flagged main 1 shoofly panel on south end to 51st
St bridge, checked top of rail elevations.
- Lined mains 1 and 2 shoofly panels.
- Located and shot existing manholes on east end of yard.
- Shot fabric limits south of 51st St and checked CA-6 and CA-7
grades.
- Asbuilt T3 fiberoptic trench.
- Graded ballast south of 51st St.
- Lined mains 1 and 2 shoofly panels north of 51st St and graded
panels for tamper.
- Cross-sectioned excavation area south of 51st St Bridge.
- Asbuilt T3 fiberoptic trench.
- Shot fabric limits and checked CA-6 grades.
- Graded ballast in excavation north of 51st St.
- Spiked and flagged edge of tie for shoofly panels.
- Graded ballast in excavation north of 51st St.
- Graded entire length new yard track 5 for tamper.
- Spiked and flagged point of switch and point of frog for switch 4.
- Mapped and recorded T3 fiberoptic paint markings for future
excavation.
- Checked and shot CA-7 and fabric limits.
- Measured and recorded area north of 51st St still in need of
fabric and stone.
- Checked cut in excavation area north of 51st St bridge.
- Lined yard track 5
- Checked and shot CA-7 and fabric limits.
- Staked 12' offset entire length of future yard track 2 for visual.
- Sprayed 12' offset yard track 2 to denote limits of future
excavation
- Asbuilt excavation south of yard track 5.
- Measured track for 5 cut and throw.
- Gave center line and graded area for track 5 south of 51st St.
- Graded yard tracks 6 and 5A for tamper.
- Asbuilt track 5A, tracks 11 and 12 stubs, west bridge deck.
- Measured rail space for track 5 panel and tracks 3 and 4 for cut
and throw to track 5.
- Checked track 5 excavation south of 51st St.
- Graded tracks 5A and 6 for tamper.
- Set and lined new tracks 5A and 6 panels.
- Cut and throw yard track 2 to track 6 on far north end.
- Asbuilt tracks 7 and 8.
- Painted out edge of tie for tracks 5A near hump and 6 in ladder
for visual.
- Graded tracks 7 and 8 with tamper.
- Cut and throw, lined and graded south end of track 6.
- Asbuilt track 6 after tamping.
- Asbuilt asphalt area over 51st St bridges.
- Set and lined switch from 5A to 6.