2011-2012 Projects
- Mapping of yard, redesign of phasing, creating and realigning yard track, grading,
- Expansion of existing hump yard, improvements to existing yard
- Realignment of Drill tracks, inbound, and outbound tracks to add two new paved roads.
- Mapping, redesign and layout of Colehour Yard in Hammond, Indiana
- Connection track off exsiting mains in Sandusky, OH
- Realign NS mains in the 21st Street Interlocker.
- Grading, new fencing, drainage improvements, and realignment of tracks from Halsted Street
to Ashland Avenue
- Mapping and property surveys of various Amtrak stations in Illinois, Indiana, and Wisconsin
- Pier & Abutment observations on Norfolk Southern Bridge over the Maumee River in Toledo,
Ohio
- Asbuilt of previously completed work near Ashland Yard as part of the CREATE project
- Track improvements from Halsted Street to Normal Avenue
- Bridge repairs at Halsted, Emerald, Union, Wallace and Normal
- Construction of new siding
- Relocation of CJ mains through Ashland Yard
- Replacement of yard switches in 47th street yard and 51st street yard
- Survey existing conditions for new crew facility building
- Mapping and R.O.W. Staking of BNSF's tracks near MP 166.4
Browning Engineering Limited
1215 Spencer Road New Lenox, Illinois, 60451 Phone: (815)463-1069 Fax: (815)463-1179
|