Browning Engineering Limited
B-C Concourse Photos
Phase 1 & 2 Limits (05/12/09)
Phase 3 & 4 Limits (05/12/09)
Puddling on the Concourse (05/15/09
)
Phase 3 & 4 (05/20/09)
Phase 1 & 2 (05/21/09)
Phase 1 [prior to sawcuts] (06/26/09)
Phase 1 E
xcavation and forms with concrete [sleeper slabs] (07/09/09)
Finished North Expansion Joint at BC Concourse (
07/16/09)
Finished concrete of north side expansion joint, 2" inch under finished
concrete and insulation on south side of expansion joint (07/23/09)
Prepared 18"-24" area for pouring (07/28/09)
Phase 1 ready for concrete (07/31/09)
Phase 1 showing finished concrete &
Excavation of the temporary service
road to complete the job
(0
8/03/09)
Temporary Road Sleeper Slab (08/05/09)
Sleeper slab and excavation done at BC Concourse Phase 2 (08/20/09)
08/24/09
Area for Proposed Catch Basin (08/27/09)
Phase 2 nearly finished (08/31/09)
Phase 2 Catch Basin Area (09/02/09)
Phase 2 Catch Basin Area (09/04/09)
Phase 4
E
xcavation and Rebar in Place for Sleeper Slab (10/12/09)
Poured extra concrete area, 18-24" area (10/29/09)
Phase 4 (11/10/09)